Selected Papers

Journals (*Corresponding):

Chinese Journals:

  • 轩昂, 刘骏, 彭维珂, 沈欣炜, 陈衡. 面向煤制氢电厂CCUS改造的规划方法及碳足迹评估[J].中国电机工程学报,2024. A. Xuan, J. Liu, W. Peng, X. Shen*, H. Chen. Planning Method and Carbon Footprint Assessment for Retrofitting Coal-based Hydrogen Power Plant with Carbon Capture, Utilization and Storage[J]. Proceedings of CSEE, 2024.

  • 杜云飞, 沈欣炜, 郦洪柯, 等.考虑微观选址的分布式海上风电制氢容量优化配置[J].电力系统自动化, 2024. Y. Du, X. Shen*, H. Li, et al. Capacity Optimization Configuration of Distributed Offshore Wind Power to Hydrogen Considering Micro-siting[J]. Autom Electr Power Syst, 2024.

  • 陈威, 王永恒, 沈欣炜,等. 计及碳排放流的光储充一体化电站及加氢站协同规划[J].电力系统自动化,2024,48(13):59-70. W. Chen, Y. Wang, X. Shen, et al. Co-planning of photovoltaic storage charging integrated stations and hydrogen refueling stations based on carbon emission flow theory[J]. Autom. Electr. Power Syst, 2024.

  • 夏添, 沈欣炜, 尚宇炜. 基于混合整数规划的配电网检修多目标优化决策及其灵敏度分析[J]. 电网技术, 2024. T. Xia, X. Shen, Y. Shang. Power Distribution System Multi-objective Maintenance Scheduling Based on Mixed-Integer Programming and Its Sensitivity Analysis[J]. Power Syst Technol, 2024.

  • 沈欣炜, 郭庆来, 许银亮, 等. 考虑多能负荷不确定性的区域综合能源系统鲁棒规划[J]. 电力系统自动化, 2019, 43(7): 34-41. Shen X, Guo Q, Xu Y, et al. Robust Planning Method for Regional Integrated Energy System Considering Multi-Energy Load UncertaintiesJ. Autom. Electr. Power Syst, 2019, 43: 34-41.

  • 沈欣炜, 朱守真, 郑竞宏, 等. 考虑分布式电源及储能配合的主动配电网规划–运行联合优化[J]. 电网技术, 2015, 39(7): 1913-1920. Shen X W, Zhu S Z, Zheng J H, et al. Active distribution network planning-operation co-optimization considering the coordination of ESS and DG[J]. Power Syst Technol, 2015, 39(7): 1913-1920.

  • 陈聪, 沈欣炜, 夏天, 等. 计及㶲效率的综合能源系统多目标优化调度方法[J]. 电力系统自动化, 2019 (12): 8. Chen C, Shen X, Xia T. Multi-objective optimal dispatch method for integrated energy system considering exergy efficiencyJ. Autom Electr Power Syst, 2019, 43(12): 60-67.

  • 沈欣炜, 郑竞宏, 朱守真, 等. 光伏并网逆变器控制参数的 dq 轴解耦辨识策略[J]. 电力系统自动化, 2014, 38(4): 38G43. Shen, Xinwei, et al. “A dq Axis Decoupling Parameter Identification Strategy for Grid Connected Inverter Controller of Photovoltaic Generation System.” Automation of Electric Power Systems. Vol. 38. No. 4. 2014. 1-6.

Conference:

  • X. Shen*, S. Li, H. Li. “Large-scale Offshore Wind Farm Electrical Collector System Planning: A Mixed-Integer Linear Programming Approach”, in 5th IEEE conf. on Energy Internet and Energy system Integration, Taiyuan, China, Oct. 2021.

  • C. Chen, X Shen*, Q. Guo, et al. “Adaptive Robust Planning-Operation Co-optimization of Energy Hubs with Modified Column-and-Constraint Generation Algorithm”, IEEE PES GM 2019, Atlanta, U.S. (best paper award, Top 3%)

  • Z. Xiong, X Shen*, B. Wang, Q. Guo et al. “Optimal Planning of Electric-heat Coupled Integrated Energy System With N-1 Constraints”, 2020 IEEE 4th Conference on Energy Internet and Energy System Integration (EI2), Wuhan, China.(best paper award, Top 3%)